uPVC window installation: from delivery to adjustment

uPVC window installation step by step: frame size, delivery and storage, 10 fitting steps, maintenance and the mistakes typical of uPVC profiles.

uPVC window installation starts before delivery, with the choice of fitting method and frame size, and ends with adjusting the hardware. The work on the window itself means setting the frame on wedges, fixing it mechanically with anchors, insulating the gap with foam and closing it with tapes in three layers. Below we go through the whole process, from taking delivery to the first service, and list the mistakes that happen most often with uPVC windows.

We do not offer fitting. We sell uPVC windows on VEKA, Kömmerling, Salamander and Gealan profiles, which you install yourself or with a fitter you choose. For years we fitted windows ourselves, so we know at which stage it is easiest to go wrong.

Before delivery: fitting method and frame size

A uPVC window can go into the reveal between the jambs, against the inner face of the wall, or over an old frame. That choice determines the frame and its size. For fitting over an old frame the configurator has a renovation frame, and for Dutch-style fitting an NL frame. Availability of both depends on the system.

The configurator asks for the frame size, not the opening. Measure the opening in three places (top, middle, bottom), take the smallest figure and deduct the fitting gap you agree with your installer. Always describe the opening side as seen from inside. Decide on top-mounted roller shutters straight away, as the box adds height. On every quote we check sizes, opening sides and item descriptions, and before production you get a drawing of every window to approve.

Delivery and storage

1. Plan the unloading. The windows arrive on stillages and can weigh over 100 kg. You need a forklift or 2–3 people. 2. Inspect the windows with the driver present. Note any damage on the delivery note and photograph it. For glass, photograph it together with the label on the spacer. 3. Store the windows upright. Under cover, on level ground, away from sun and damp. 4. Keep the documents. The delivery includes the declaration of performance and CE documentation.

uPVC window installation step by step

This is a general outline. Details depend on the system and the wall, so always follow the instructions from the window and fixings manufacturers.

1. Prepare the opening. Remove dust, old mortar and loose plaster. The surface for the tapes must be clean and dry. 2. Take the sash off large windows. The frame alone is lighter, easier to position, and the hinges carry no load. 3. Apply tapes to the frame. Vapour-tight on the room side, vapour-permeable outside. With the frame lying flat you will get them on more neatly. 4. Set the frame on wedges and packers. Level and plumb it and check the diagonals. A uPVC frame must not be twisted or bowed. 5. Fix it mechanically. Anchors or frame fixings roughly every 70 cm, at least 2 per side. uPVC profiles bend easily, so do not overtighten. 6. Refit the sash and test it. It should close without force and press evenly on the seal. 7. Fill the gap with foam. Foam insulates; it does not hold the window. As a guide, one can covers about 6 m of perimeter. Do not overfill: expanding foam can bow the frame. 8. Close the tapes. Bond the vapour-tight tape to the wall inside and the permeable tape outside. That gives the three-layer seal. 9. Fit the sills. Do not cover the drainage slots at the bottom of the frame with the external sill or with silicone. 10. Finish the reveals with plaster or trims, depending on the fitting method.

After fitting: film, adjustment, maintenance

Remove the protective film no later than 4 weeks after delivery, even if plastering is still going on. Adjust and service the hardware at least once a year and wipe the seals. uPVC profiles never need painting. Regular hardware maintenance is also a condition of the 2-year GALI warranty, which covers profiles, hardware, sealed units, roller shutters and motors.

Common uPVC installation mistakes

  • Opening size instead of frame size. This is the error we catch most often when checking quotes. Without a gap, the window will not go in or leaves no room for insulation.
  • Opening side described from outside. The handle ends up on the wrong side.
  • Overtightened fixings or too much foam. The profile bows and the sash no longer seals evenly.
  • Foam instead of fixings. The window shifts over time.
  • Blocked drainage. Water sits in the bottom of the frame.
  • Doors or sliding units left exposed. The warranty requires doors and sliding units to be sheltered from rain and full sun. Dark door panels can deform in full sun, which the warranty does not cover.
  • Fitting that ignores the manufacturer's instructions. The warranty does not cover damage from incorrect installation.

From choice to delivery

Put together your uPVC windows in the configurator and see the price straight away. You can compare several systems from our uPVC range, from 76 mm profiles up to Kömmerling 88 MD with Uw from 0.73. The configurator also suggests fitting materials: foam, tapes, anchors and wedges. Your quote including delivery arrives within 3 working days, and production takes 3–8 weeks after payment. The whole route from sizes to delivery is described in windows from Poland without middlemen.