GALI
Process

From idea to windows on site.

Six steps from configuration to delivery, with no sales visit.

  1. 01

    You configure or send dimensions

    Build the window in the configurator, or simply send a list of dimensions, a photo of the opening or the architect's drawing. That's enough for us to know what we're dealing with.

  2. 02

    You get a quote

    You already see the window price in the configurator. The quote adds the drawings, lead time and transport — in specific figures, not a “from” price. If something doesn't work technically, we say so straight away.

  3. 03

    We settle the details

    Colours from the colour chart, glazing, hardware, sills. We advise, but the decisions are yours — we don't push extras.

  4. 04

    You confirm the order and pay

    You confirm the order with the specification and dimensions and pay in full. From then on the dimensions are locked — so it's worth checking them twice.

  5. 05

    Production

    Your windows are made in Polish factories within 3–8 weeks of receipt of payment, depending on the system, colour, roller shutters and season. We put the exact date in the quote and let you know what stage your order is at.

  6. 06

    Delivery to site

    We deliver to your address in Poland or abroad. Unloading is on your side — we'll tell you how many people you'll need.

What you need to prepare

  • Opening dimensions — ideally measured in three places (top, middle, bottom) and recorded as the smallest value.
  • The opening side for each window — viewed from inside the room.
  • Space for unloading and someone to help — windows can weigh over 100 kg.
  • An installation team booked for the agreed date. If you don't have one, we'll tell you what to ask of them.

Start with a quote

You don't need a finished design. Knowing roughly how many windows you need is enough.