GALI
← All articles
Blog · 13 November 2026 · 4 min read

Replacement window frames fitted over the old frame

Replacement window frames that fit over the old one, with no plaster broken out: when it works, 10 steps and the sizing mistakes to avoid.

Replacement window frames for renovation fit over the old frame: the existing frame stays in the wall and the new one sits on it, with no plaster broken out and no damage to the reveals. In France this is called "pose en rénovation". It works when the old frame is sound and stable and you want a quick swap without building work around the windows. Below: when it makes sense, how to do it step by step and which mistakes to avoid.

We do not offer fitting. For years we made and installed windows ourselves; today we sell only the product: made-to-measure uPVC and aluminium windows, priced instantly in the configurator. You fit them yourself or with a fitter you choose.

When do replacement window frames over the old frame make sense?

Fitting over the old frame makes sense when:

  • the old frame is dry, straight and firmly fixed in the wall, and the timber is not rotten;
  • you want to avoid breaking out, dust and replastering, for example in a lived-in house;
  • the plaster, reveals and internal sills are in good condition and you want to keep them.

Go for a full replacement when the old frame is rotten, split or loose. The new frame has to be held firmly, and a weak substrate cannot guarantee that. There are two limits to know about. The new frame sits inside the old one, so the glass ends up slightly smaller than with a full replacement. And the old joint between frame and wall stays as it is, along with its insulation.

Step by step

This is a general outline. Details depend on the system, the old frame and the wall, so always follow the instructions from the window and fixings manufacturers.

1. Check the old frame. Probe the timber with a screwdriver at the corners and along the bottom, where water collects. The frame must not move. 2. Measure inside the old frame. Width and height in three places (top, middle, bottom), taking the smallest figure. Agree the size of the renovation frame with your fitter, as it depends on the profile of the old frame. 3. Check the system in the configurator. Not every system has a renovation frame, so pick one that does. In your enquiry, say clearly that the window goes over the old frame. 4. Prepare the old frame. Remove the old sashes, protruding hardware and remains of seals. The surface the new frame will sit on must be clean and even. 5. Apply tapes to the new frame. Vapour-tight on the room side, vapour-permeable outside. 6. Position the new frame. On wedges, level and plumb, diagonals checked. 7. Fix it mechanically. The fixings must bite into sound material. As a guide, anchors or screws roughly every 70 cm, at least 2 per side. Do not overtighten. 8. Seal the joint. Fill the gap between new and old frame with foam and close it with tapes: airtight inside, vapour-permeable outside. Foam insulates; it does not hold the window. Keep the drainage slots at the bottom of the frame clear. 9. Fit the trims. The joint is covered inside and out with trims or cover profiles. Agree the material and method with your builder. 10. Adjust the sashes and remove the film. The sash should close without force. Remove the protective film no later than 4 weeks after delivery.

Common mistakes

  • Size taken from the masonry. For renovation fitting, what counts is the clear opening of the old frame, not the wall. Mixing up opening size and frame size is the error we catch most often when checking quotes.
  • Fitting method not stated. If the enquiry does not say the window goes over the old frame, the size can be read two ways. On every quote we check sizes, opening sides and item descriptions, but only you know how it will be fitted.
  • Opening side described from outside. Always describe it as seen from inside.
  • Shutter added at the end. A top-mounted roller shutter box adds height to the window. If you want one, choose it with the window, before fixing the size.
  • Fixing into rotten timber. The window holds only as well as the material under the fixing.
  • Fitting that ignores the instructions. The 2-year GALI warranty does not cover damage from incorrect installation.

Grants for window replacement

Many countries offer grants for replacing windows. In France, MaPrimeRénov' funds windows in 2026 only as part of a whole-house renovation carried out by an RGE-certified company, so it does not apply when you buy without fitting. Other grants have their own conditions and often also require installation by a qualified company. Before you set your budget, check the current rules on the scheme's official website or with an adviser.

Ordering renovation windows from us

Put your windows together in the configurator, choose a system with a renovation frame and compare prices across several profiles. You can choose uPVC windows from Kömmerling, VEKA, Salamander and Gealan, or Aluprof aluminium. You get a quote including delivery within 3 working days, then a drawing to approve before production. If you are unsure about the material, read uPVC or aluminium, or send us photos of your old windows via contact.

A question that isn't here?

Have a question? Write to us.