Replacing windows: a step-by-step plan in 10 steps

Replacing windows step by step: list of openings, shutters, measuring, quote, delivery and fitting. The full plan and the mistakes you will avoid.

Replacing windows starts with decisions, not with a tape measure: first you decide which windows to replace, with which extras and who will fit them. Then you measure the openings, price the windows, approve the drawing and pay, and after 3–8 weeks of production the windows arrive at your door. Below is the whole plan in 10 steps and the mistakes we most often correct in quotes.

Replacing windows: the plan step by step

1. List the openings. Number every window and door you want to replace and photograph each opening from inside. Identical windows go down as one item with a quantity.

2. Decide on extras straight away. Roller shutters, fly screens and external sills are ordered together with the windows. The most important one is a top-mounted shutter, because its box adds to the window height. Deciding after the quote means recalculating the sizes.

3. Choose the material and system. uPVC insulates well for less money; aluminium is chosen for large glazing and slim profiles. The comparison is in our article uPVC or aluminium. Settle the glazing and colour too: white, colour outside and white inside, or the same colour on both sides.

4. Check the rules and grants in your country. In Germany, the GEG requires a Uw of no more than 1.3 W/(m²K) when windows are replaced in residential buildings, and 1.6 for lift and slide doors. Grants for windows exist in many countries, but they come with conditions and often require fitting by a company. Check them on the official website of the scheme before you order.

5. Book a fitter. We do not offer installation and do not recommend particular firms. Agree the fitting method with your fitter: a standard frame in the opening, a renovation frame over the old frame without disturbing the plaster, or a frame for Dutch-style fitting, with or without a fin. Which frames are available depends on the system.

6. Measure the openings. Measure in three places: top, middle and bottom. Note the smallest figure and subtract the fitting gap, usually 2–3 cm. Describe the opening side of each window as seen from inside.

7. Price the windows. In the configurator you see the price straight away, after every change. You can price the same project in several systems.

8. Approve the quote and drawing. We prepare the quote with transport within 3 working days. Before production you receive a drawing and specification to approve. Once 100 % is paid, the sizes are locked, so this is the last chance to make changes.

9. Take delivery. The windows travel on racks to the site address. Unloading is your job: a forklift or 2–3 people, because a window can weigh over 100 kg. Check for damage while the driver is there. Store the windows upright, under cover, away from sun and moisture, and remove the protective film no later than 4 weeks after delivery.

10. Take out the old windows and fit the new ones. Remove the old windows only once the new ones are on site. A new window is fixed mechanically, with frame fixings or plugs; foam is only there for insulation. Details depend on the system and the wall, so follow the manufacturer's instructions. Keep the declaration of performance and CE documents that come with the delivery.

How long does the whole plan take?

Production takes longest: 3–8 weeks from receipt of payment, depending on the system, colour, shutters and season. The exact date is in the confirmation, and you can see photos of the finished windows on the order tracking page before dispatch. Add time for decisions and measuring, up to 3 working days for the quote, and transport. Book your fitter once you know the production date.

The most common mistakes when replacing windows

We have worked with windows since 1997 and completed more than 5000 orders. These mistakes come from the process itself and are the ones we see most:

  • The opening size entered as the window size. The window has to be smaller than the opening by the fitting gap, otherwise it will not go in.
  • The opening side described from outside. The handle and hinges then end up on the opposite side.
  • A top-mounted shutter added after the quote. The height has to be recalculated, because window and box must fit into the same opening together.
  • A sash that is too narrow. We do not make opening sashes narrower than 450 mm. Instead of two narrow sashes, one sash and a fixed pane works better.
  • Two different colours inside and out. In uPVC we make colour outside with white inside, or the same colour on both sides, one colour per order.
  • No one to unload. The driver does not unload alone, and unloading takes up to 2 hours.

How to price a project in a few minutes is shown in our article on the window configurator. The full journey from order to delivery is on the how it works page.

The first step: a priced list

Once you have your list of openings and know whether you want shutters, put your windows together in the configurator. You see the price straight away, and the quote with transport follows within 3 working days. Have drawings from an architect or a window schedule? Send them via the contact page.